Installation Instructions for 83KW/93KW–85KW/95KW IDH Max Cylindrical Locks
BEST ACCESS SYSTEMS
Indianapolis, Indiana
17
Installation Instructions for 83KW/93KW–85KW/95KW IDH Max Cylindrical Locks
Completing the installation at the door
20 Install wire transfer hinge
1 Trim the four wires of the field wire harness, which you
pulled through the hinge edge of the door in Task 7.
Leave sufficient length to connect to the wire transfer
hinge.
2 Splice the power and communication field wiring to
the four pairs of leads on the frame side of the hinge,
following the hinge manufacturer’s instructions.
3 Splice the four field harness wires (listed in the table
below) to the four pairs of leads on the door side of the
hinge, matching each pair of leads to its
corresponding field wire.
4 Insert the wires and splice connectors into the holes or
pockets in the door and frame, being careful not to
pinch the wires. Install the wire transfer hinge.
21 Install lock power supply (optional)
If you are providing a separate power supply for the
lock instead of providing power via the panel interface
module, connect the two power field wires (run from
the wire transfer hinge) to the power supply. Make
sure power (12 volts DC) and ground are connected
properly.
Follow the instructions provided by the power supply
manufacturer. Do not plug in the power supply yet.
Note: For specifications for the power supply, see
Components checklist, on page 2.
Wire Color
Ground Black
12 VDC Red
Com+ Orange
Com– Green
Figure 20 Installing the wire transfer hinge
Access holes
Field wire
harness leads
Wire transfer
hinge
Door frame
Field wires
Splice
connectors
Door